Drove under heavy rain to a far-away-bikeshop in order to fetch a new bottom bracket cartridge with the required spindle length. Right now the bike's got a new axle and chain. The pedals were fully disassembled, cleaned, oiled and reassembled. Chainrings are gleaming. Everything seems to be running smoothly now. No time for a test-ride.
Friday, 14 May 2010
Drivetrain overhaul
Drove under heavy rain to a far-away-bikeshop in order to fetch a new bottom bracket cartridge with the required spindle length. Right now the bike's got a new axle and chain. The pedals were fully disassembled, cleaned, oiled and reassembled. Chainrings are gleaming. Everything seems to be running smoothly now. No time for a test-ride.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment